ABOUT TOPTAŞ ENERJİ
We consider energy infrastructure as a whole.
Toptaş Enerji was established in April 2006 to carry out surveys, plans and profiles, electrical designs, setting out, expropriation plans and construction work for high- and medium-voltage power lines and distribution systems.
Through our work in Türkiye and internationally, we see knowledge of the terrain, the calculations behind design decisions and field implementation as connected parts of the same process.
Today, we complement our power line design experience with UAV LiDAR surveying and mapping, consultancy and technical support. We assess the scope of work in the context of each project’s conditions.

2006 / TOPTAŞ ENERJİ
From our foundation to today
Our early work included power line construction connecting Gölova HEPP, Konak HEPP, Beypınar HEPP, Altuntepe HEPP and Suşehri Substation. This field experience helped shape our integrated approach to design, expropriation, setting out and construction.
ENGINEERING CULTURE
How we work
Knowledge and experience
A team approach that considers site conditions, technical requirements and implementation needs together.
Technical consistency
A consistent project flow connecting measurements, drawings, calculations and implementation.
Clear communication
An approach that clarifies scope, deliverables and technical requirements from the start.

