TECHNICAL SERVICE SCOPE

Medium-Voltage Power Line Design

Design scope from electrical and mechanical calculations to installation drawings for medium-voltage lines, including short-span and shared-support arrangements.

01 / SCOPE

What does the service cover?

MV line design

Electrical and mechanical engineering of overhead and underground lines.

Short spans and shared supports

Dedicated design-basis, site-plan, duct, pole/crossarm, single-line and quantity items for these arrangements are retained.

02 / TECHNICAL CONTENT

Drawings, calculations and deliverables

Facility information form

Design basis including line purpose, name, conductor size, circuit count, length, ice-load zone, support/insulator types, connection and route rationale, and project-specific calculations.

Plan and profile

Plan and profile at horizontal 1/2000 and vertical 1/500 or 1/400 according to conductor type, marking angle points and terminal supports.

Route and site plans

A 1/25000 route plan with support and angle-point coordinates; supplementary 1/1000, 1/2000 or 1/5000 connection/site plans for lines under 1 km.

Cable laying drawings

Cable laying at 1/1000 or 1/2000 on planning, cadastral or surveyed bases, with duct type, cable characteristics, lengths and connection nodes.

Cable ducts and special crossings

Scaled duct and special crossing details based on cable characteristics, circuit count and cable arrangement.

Pole and crossarm selection schedule

Pole and crossarm types, chainages and spans, design ranges, angles, crossings, conductor/insulator arrangements and leg details.

Initial and final conductor sag

Initial and final sag, with maximum sag values at 5° temperature intervals across the critical range for the ice-load zone and conductor characteristics.

Principle single-line diagram

A principle single-line diagram showing all nodes and loads from the main supply substation to the connection point.

Voltage drop, power loss and thermal checks

Voltage drop, power loss and conductor thermal calculations considering every load between the supply substation and the connection point.

Insulator swing calculations

Weight-span and wind-span relationships for suspension supports, with calculation records for special support arrangements.

Short-circuit calculations

Equivalent impedance of circuit elements up to the calculation point and short-circuit calculations for underground cable lines.

Pole strength, swing and clearance checks

Force and strength checks for special supports or individually determined design ranges, conductor swing diagrams and overhead clearance calculations.

Special conductor electrical calculations

Resistance, magnetic flux, inductance and reactance where standard calculations do not cover the arrangement, supplying inputs for voltage drop and power loss calculations.

Bill of quantities

A bill of quantities covering materials, installation, removal and reinstallation items in the design.

Material schedule

Support types, quantities and weights; suspension/tension sets, insulators, conductor types/lengths/weights, surge arresters, marker balls and warning plates.

Short-span / shared-support line: Facility information form

Purpose, technical characteristics, connections, route information, design rationale and specific calculations for short-span or shared-support lines.

Short-span / shared-support line: Site plan

A 1/1000, 1/2000 or 1/5000 site plan showing connections; duct types, cable characteristics, lengths and nodes for cable sections.

Short-span / shared-support line: Cable ducts and special crossings

Duct and special crossing details based on circuit and laying arrangements for cable sections of short-span or shared-support lines.

Short-span / shared-support line: Pole and crossarm selection schedule

Pole/crossarm types, spans, design ranges, angles, crossings, conductor arrangements, insulators and leg details.

Short-span / shared-support line: Principle single-line diagram

A diagram of nodes and loads from the main supply substation to the line connection.

Short-span / shared-support line: Bill of quantities

Materials, installation, removal and reinstallation quantities for short-span and shared-support lines.

03 / WORKING PROCESS

Technical support from data to implementation

  1. Review design inputs

    Review available design, connection, field or cadastral information against the scope.

  2. Prepare the technical package

    Coordinate the drawings, calculations and schedules for the service.

  3. Institutional submission and technical follow-up

    Submit the package to the relevant institution and follow its technical review.

Let’s assess the technical needs of your project.

Connect field conditions, engineering design and implementation.

Discuss your project

Privacy and this website

This website does not use visitor analytics tools or advertising cookies. Email and telephone links are used for communication. The Instagram link opens the external service.

info@toptasenerji.com ↗